İskenderun-Elazığ constructionTransport

Bridge segments loadings from İskenderun went to District of Elazığ/Ağın  Karamağara Bridge build. Total transport is 5000tons bridge segments. Segmets size was between 5,15x4,00x16,00 and 87ton with 36 ton in size 5,35x4,00x18,00   transport was completed. (MAY 2014)

Related Images